Here's a picture of the shop this week. We hung the heater, ran the gas line, and dropped the heater back down. The attic floor has been raised to allow 9" of insulation. The 5/8" drywall is hung on the ceiling, and I got all 11 light fixtures hung.
Gotta get rid of the old TVs and bikes from my mom's place soon.
When I get back from my trip to the NW we are going to hang the walls, then the whole thing will be taped and textured. I hope to have it painted by mid-September, and then paint the floor so I can move in.
20130813_001 (1).jpg20130813_002 (1).jpg