Just joined? Please introduce yourself.
Page 3 of 7 FirstFirst 12345 ... LastLast
Results 21 to 30 of 61

Thread: Building New Shop

  1. #21
    Registered Member chevynut's Avatar
    Join Date
    Nov 2011

    Member #:115
    Location
    Fort Collins, CO
    Posts
    10,835
    Yahoo! Are you still on schedule for mid October?
    56 Nomad, Ramjet 502, Viper 6-speed T56, C4 Corvette front and rear suspension


    Other vehicles:

    56 Chevy 2-door BelAir sedan
    56 Chevy 210 4-door sedan
    57 Chevy 210 4-door sedan
    1962 327/340HP Corvette
    1961 Willys CJ3B Jeep
    2001 Porsche Boxster S
    2003 Chevy Silverado 2500 HD Duramax
    2019 GMC Sierra Denali Duramax

  2. #22
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    Yes and possibly a bit earlier, but construction has a way of changing your schedule.

  3. #23
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    Well progress is being made, sold one house, closed on another to build the shop at and signed the contract for the building. Drawings are coming in about 3 weeks and then about 6 weeks to delivery the building.

  4. #24
    Registered Member carls 56 (RIP 11/24/2021)'s Avatar
    Join Date
    Jan 2011

    Member #:33
    Location
    Culpeper, Va.
    Posts
    1,857
    sounds like everything is working out, that's great. .......... new house, new baby.
    ARMY NAM VET, very proud!

    56 210 4dr

    drive and enjoy them while you work on them, life is to short.

  5. #25
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    One step closer, plans finally finished and submitted for permit today, County said about 5 days for review and then see what I need to fix.

  6. #26
    Registered Member NickP's Avatar
    Join Date
    Mar 2012

    Member #:1653
    Location
    De Queen, AR
    Posts
    4,157
    Quote Originally Posted by Fladiver64 View Post
    Well progress is being made, sold one house, closed on another to build the shop at and signed the contract for the building. Drawings are coming in about 3 weeks and then about 6 weeks to delivery the building.
    What manufacturer did you decide upon?

  7. #27
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    Got my permit today and then found out the contractor I choose for erection of the building in on an out of state job for 7 weeks. Just my luck, so now building will go up Nov 16th. Still gives me plenty of time to get concrete finished before then.

    Nick, I went with Outback Buildings, mostly because they had a local rep and a compete team that was local which made construction easier. I also go to go look at several buildings they have done here that have been up for 10 years and they still look great. All of their steel is galvanized which makes a big difference here in the land of humidity. For me it was the bet compromise of quality, cost and utility.

  8. #28
    Registered Member chevynut's Avatar
    Join Date
    Nov 2011

    Member #:115
    Location
    Fort Collins, CO
    Posts
    10,835
    Fladiver, does that change the schedule for your C4 project? I'm trying to work something out to help transport your frame for you.
    56 Nomad, Ramjet 502, Viper 6-speed T56, C4 Corvette front and rear suspension


    Other vehicles:

    56 Chevy 2-door BelAir sedan
    56 Chevy 210 4-door sedan
    57 Chevy 210 4-door sedan
    1962 327/340HP Corvette
    1961 Willys CJ3B Jeep
    2001 Porsche Boxster S
    2003 Chevy Silverado 2500 HD Duramax
    2019 GMC Sierra Denali Duramax

  9. #29
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    I am flexible on the frame, if I end up with it early then I can figure out how to store it in my current garage. If waiting a bit makes things work out better than that will work for me too.

  10. #30
    Registered Member Fladiver64's Avatar
    Join Date
    Jun 2014

    Member #:2209
    Location
    Kissimmee, Fl
    Posts
    125
    Finally breaking ground! Pad getting formed and concrete scheduled for Tuesday
    Attached Images Attached Images

Page 3 of 7 FirstFirst 12345 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •