A piece of the puzzle to the new shop starts this morning, when we lower in a new septic tank which will also be able to handle a bathroom in the shop (puzzle piece) LOL actually we needed to replace the system here anyway as it was a old septic system that has lived out its life. The plan was to start on the shop around June 1st time frame but when i got pushed back that pushed back the person who is helping me with the shop so hopefully speaking i can have some pics by the end of July of new building, can not wait i am not used to having a place to work on things and the little garage we have now is a overgrown storage unit.